River Terminal Flood Prevention, New Jersey, USA

Solutions applied
Products used
Project size
  • 10000 m2

New Elevetor was used in the construction of a warehouse in Kearny, New Jersey. It was the fastest and least expensive solution for this flood-prone area near the Hudson River.

New Elevetor can be easily installed in any worksite and creates foundations of varying heights, resulting in a substantial barrier between the ground and the building. This system offers a safe solution in areas at risk of frequent flooding.




//Show ZOHO chat on Geoplast.it English